Railway Cost Estimator
FreeEstimate railway works budget: track, catenary, signalling, civil engineering. Cost per linear metre, duration, breakdown by item.
Compliant with NF EN 13848 / SNCF Réseau
📊Indicative budget estimate
Estimated budget (excl. VAT)
810 K€HT
Cost per linear metre
1 620€/ml
Estimated works duration
6 jours
Railway safety share
15%
ℹ️
These estimates are orders of magnitude based on averages observed in railway public contracts. Actual costs depend on specific project conditions.
⚠️
Night/weekend work windows generate a 20-40% surcharge compared to continuous daytime works.
Estimated breakdown
Main works551 K€
Traffic safety122 K€
Studies and engineering65 K€
Site installation41 K€
Testing and acceptance32 K€
Standards & regulations
- SNCF RéseauRéférentiel prix travaux ferroviaires
- EPSFExigences sécurité des circulations
- NF EN 13848Qualité géométrique de la voie
This tool provides indicative estimates. Results do not substitute professional advice. Always verify with current regulations.