Construction Technical Proposal - Complete Template

Complete structure for works contracts: structural work, finishing, renovation. Includes quality plan, Gantt schedule, waste management and quality control sheets.

The document is in French, as required by French public procurement. The guidance inside is written to be followed step by step.

Get the template by email

The market in figures

French public procurement open data, 12 rolling months, as of 2026-08-25.

56,950
contracts awarded
20,933
winning companies
6,740
active buyers
154,038 EUR
median amount
12 months
median duration

What the buyer actually scores

Weightings observed on this type of contract.

Works methodology and phasing

25 a 40 %

The buyer checks that you understood the site constraints: co-activity, access, hours, keeping the building in service. Generic phasing is spotted immediately.

Assigned human and material resources

15 a 30 %

Named supervision: site manager and foreman identified with their references. Equipment must be listed with specifications, not by category.

Safety, environment and waste management

10 a 25 %

This criterion is rising since construction waste sorting rules. Announced recovery rates must be backed by named channels.

Mistakes that get a bid rejected

Specific to this sector, not generic advice.

  • Providing a Gantt chart with no critical path or contractual milestones. The buyer looks for zone handover dates, not a decorative timeline.
  • Omitting the health and safety plan or postponing it when the rules require it at bid submission. A frequent irregularity in works contracts.
  • Listing site references with no amount, year or client. An unverifiable reference does not count.

Required documents and qualifications

To gather before you start writing.

  • Qualibat : Qualification by trade and technical level. Often required or strongly valued in works contracts.
  • Assurance decennale : Mandatory on construction works. The certificate must cover the exact activities of the lot.
  • Certification environnementale : ISO 14001 or equivalent. Increasingly requested on public renovation contracts.

Template excerpt

Items in brackets are for you to complete.

Works methodology and phasing

L'intervention se deroule en [nombre] phases sur [duree] semaines. La phase preparatoire comprend l'installation de chantier, la mise en place des protections collectives et le constat d'huissier prealable. Le maintien en exploitation du batiment impose un phasage par zones : la zone [A] est liberee avant l'ouverture de la zone [B], selon le calendrier joint. Les nuisances sonores sont concentrees entre [horaire] et [horaire], hors periodes definies par le maitre d'ouvrage.

Sections included

  1. 1.Customizable cover page
  2. 2.Automatic table of contents
  3. 3.Understanding the need
  4. 4.Company presentation
  5. 5.Works methodology
  6. 6.Human resources - Org chart
  7. 7.Material resources
  8. 8.Site schedule (Gantt)
  9. 9.Quality assurance plan
  10. 10.Safety and health plan
  11. 11.Waste and environment management
  12. 12.Site references