Calcolo tasso di valorizzazione rifiuti di cantiere

Gratuito

Calcolate il tasso di valorizzazione dei rifiuti di cantiere dai volumi dei cassoni. Tonnellaggio per flusso e formulazione pronta.

Conforme a Loi Climat art. 35 / Code env. R. 541-45 / Décret PEMD 2021-822

Volumes by waste type

Enter volumes in cubic metres as tracked on site (number of skips times their capacity).

m3
m3
m3
m3
m3
m3

Your indicators for the technical proposal

Recovery rate

0 %

Estimated total tonnage

0.0 t

Recovered tonnage

0.0 t

Breakdown by stream

StreamEstimated tonnageStream rateRecovered

Wording you can reuse in your proposal

Enter at least one volume to get a wording.

⚠️
These values are estimates based on industry ratios. In a technical proposal, quote the actual tonnages from your waste tracking slips as soon as you have them: your commitments become contractual on award.
💡
Always state your method and reference period. A rate without a calculation basis has no probative value.

Norme e regolamenti

  • Loi n° 2021-1104, art. 35Considération environnementale obligatoire dans tout marché public depuis le 22 août 2026
  • Code env. art. R. 541-45Bordereau de suivi des déchets, pièce justificative du taux de valorisation
  • Décret n° 2021-822Diagnostic PEMD avant démolition ou réhabilitation significative

Questo strumento fornisce stime indicative. I risultati non sostituiscono il parere di un professionista qualificato.

Rispondete a un appalto?

Generate la vostra proposta tecnica con competenza settoriale attivata.

Generare proposta tecnica