♻️

Cálculo tasa de valorización residuos de obra

Gratis

Calcule la tasa de valorización de sus residuos de obra a partir de los volúmenes de contenedores. Tonelaje por flujo y redacción lista.

Conforme a Loi Climat art. 35 / Code env. R. 541-45 / Décret PEMD 2021-822

Volumes by waste type

Enter volumes in cubic metres as tracked on site (number of skips times their capacity).

m3
m3
m3
m3
m3
m3

Your indicators for the technical proposal

Recovery rate

0 %

Estimated total tonnage

0.0 t

Recovered tonnage

0.0 t

Breakdown by stream

StreamEstimated tonnageStream rateRecovered

Wording you can reuse in your proposal

Enter at least one volume to get a wording.

⚠️
These values are estimates based on industry ratios. In a technical proposal, quote the actual tonnages from your waste tracking slips as soon as you have them: your commitments become contractual on award.
💡
Always state your method and reference period. A rate without a calculation basis has no probative value.

Normas y regulaciones

  • Loi n° 2021-1104, art. 35Considération environnementale obligatoire dans tout marché public depuis le 21 août 2026
  • Code env. art. R. 541-45Bordereau de suivi des déchets, pièce justificative du taux de valorisation
  • Décret n° 2021-822Diagnostic PEMD avant démolition ou réhabilitation significative

Esta herramienta proporciona estimaciones indicativas. Los resultados no sustituyen el asesoramiento profesional.

¿Responde a una licitación?

Genere su propuesta técnica con experiencia sectorial activada.

✨ Generar propuesta técnica