Construction waste recovery rate calculator

Free

Calculate the recovery rate of your construction waste from skip volumes. Tonnage by stream and ready-to-use wording for your proposal.

Compliant with Loi Climat art. 35 / Code env. R. 541-45 / Décret PEMD 2021-822

Volumes by waste type

Enter volumes in cubic metres as tracked on site (number of skips times their capacity).

m3
m3
m3
m3
m3
m3

Your indicators for the technical proposal

Recovery rate

0 %

Estimated total tonnage

0.0 t

Recovered tonnage

0.0 t

Breakdown by stream

StreamEstimated tonnageStream rateRecovered

Wording you can reuse in your proposal

Enter at least one volume to get a wording.

⚠️
These values are estimates based on industry ratios. In a technical proposal, quote the actual tonnages from your waste tracking slips as soon as you have them: your commitments become contractual on award.
💡
Always state your method and reference period. A rate without a calculation basis has no probative value.

Standards & regulations

  • Loi n° 2021-1104, art. 35Mandatory environmental consideration in every public contract since 22 August 2026
  • Code env. art. R. 541-45Waste tracking slip, supporting evidence for the recovery rate
  • Décret n° 2021-822PEMD diagnosis before significant demolition or renovation

This tool provides indicative estimates. Results do not substitute professional advice. Always verify with current regulations.