🌱

Environmental criterion checklist

Free

Check your response to the environmental criterion mandatory since 22 August 2026. Separates performance conditions from scored criterion, by sector.

Compliant with Loi Climat et Résilience art. 35 / CCP L. 2112-2 et L. 2152-7

Your contract

Points to check before submitting

Completion

0 %

Blocking points left

3

Recommended length

To be determined

Award criterion - scored

Performance conditions - not scored

Evidence and monitoring

🚨
Blocking points remain. Their absence may make the bid irregular or cost you the environmental criterion entirely.
⚠️
Do not mix the two registers: a performance obligation belongs in the methodology, a scored criterion belongs in a dedicated part.
💡
Never invent a figure. Your commitments become contractual on award and may be monitored throughout the contract.

Standards & regulations

  • Loi n° 2021-1104, art. 35Climate and Resilience Act - mandatory environmental consideration since 22 August 2026
  • CCP art. L. 2112-2Performance conditions including environmental considerations
  • CCP art. L. 2152-7Award criterion on the environmental characteristics of the bid
  • TA Caen, 03/08/2026, n° 2602552The criterion must relate to the subject matter, not the bidder's general CSR policy

This tool provides indicative estimates. Results do not substitute professional advice. Always verify with current regulations.

Responding to a public tender?

Generate your technical memorandum with sector expertise enabled.

Generate a technical memorandum